Title Improvements of PKUAMS for precision 14C analysis of the project of Xia-Shang-Zhou chronology
Authors Liu, Kexin
Guo, Zhiyu
Lu, Xiangyang
Ma, Hongji
Li, Bin
Wang, Jianjun
Zhou, Guanghui
Yuan, Jinglin
Ren, Xiaotang
Zhao, Qiang
Zhang, Zhengfang
Zhang, Guijun
Yuan, Sixun
Wu, Xiaohong
Li, Kun
Chen, Chia-erh
Affiliation Institute of Heavy Ion Physics, Peking University, Beijing 100871, China
Department of Archaeology, Peking University, Beijing 100871, China
Issue Date 2000
Publisher Nuclear Instruments and Methods in Physics Research, Section B: Beam Interactions with Materials and Atoms
Citation Nuclear Instruments and Methods in Physics Research, Section B: Beam Interactions with Materials and Atoms.2000,172,70-74.
Abstract To meet the requirements of the Xia-Shang-Zhou Chronology project, an upgrade of the AMS facility at Peking University has been carried out, commencing in 1996, and a new sample preparation system with high efficiency and low memory has been set up in the Department of Archaeology. A NEC MC-SNICS ion source has been installed and the injection system has been reconstructed. Computer control of the beam line has been implemented using Group 3 ControlNet, and a new data acquisition system has been developed. The alignment and vacuum of the beam line have also been improved. The upgraded system was commissioned in 1998. Subsequent experience has led to efficient procedures for beam tuning and 14C/13C measurement. A precision of 0.5% in the 14C/13C ratio has been achieved. Many samples have now been measured for the Xia-Shang-Zhou Chronology project.
URI http://hdl.handle.net/20.500.11897/461131
ISSN 0168583X
DOI 10.1016/S0168-583X(00)00223-8
Indexed EI
Appears in Collections: 物理学院
考古文博学院

Files in This Work
There are no files associated with this item.

Web of Science®


0

Checked on Last Week

Scopus®



Checked on Current Time

百度学术™


0

Checked on Current Time

Google Scholar™





License: See PKU IR operational policies.